- 01. Foul Sewer (946K)
- 02. Storm Sewer (770K)
- 03. Storm & Foul (926K)
- 04. Watermain 1 (1MB)
- 05. Watermain 2 (764K)
- 06a. Autotrack 1 (1MB)
- 06b. Autotrack 2 (1MB)
- 07. Existing Site Layout (538K)
- 08. Proposed Site Levels (687K)
- 09. Typical Construction Details (837K)
- 10. Foul Longitudinal Section (83K)
- 11. Storm Longitudinal Section (83K)
- 12. Typical Details (835K)